PRODUCTION - 09 May 2022, Saxony, Sitten/Leisnig: At the wind farm in the municipality of Sitten, near Leisnig, height assemblers from the construction company Max B?gl (Upper Palatinate) are pulled by a crane with a platform onto the reinforced concrete tower of a wind turbine under construction. Two new large wind turbines at the Sitten wind farm in Leisnig are scheduled to go into trial operation in June. The two turbines have been erected in recent months as part of the so-called repowering program. Old, less powerful turbines are dismantled and replaced by new wind turbines. The official commissioning of the two new wind turbines is planned for September, the operator Eurowind Energy announced on request. Photo: Waltraud Grubitzsch/dpa